Jump to a day
On jobsDrive (est)Gap 15m or lessGap 16-30mGap over 30mClock-in / out
Install
06:56punch in9mdrive to 1st07:48first job12:47last job9mdrive from last13:25punch out6.5hclocked1 stops · 29m evening · shop +18m over
Fertilization
06:43punch in34mdrive to 1st07:32first job14:20last job8mdrive from last15:31punch out8.8hclocked4.4hroute drive / day8 stops · 1.1h evening
Humberto Lira
Fertilization
07:00punch in3mdrive to 1st07:31first job12:34last job2mdrive from last13:04punch out6.1hclocked9mroute drive / day13 stops · 28m evening · shop +3m over
Nathan Speck
Fertilization
07:33punch in2mdrive to 1st07:44first job11:58last job5mdrive from last12:16punch out4.7hclocked10 stops · 13m evening
Mowing
06:36punch in54mdrive to 1st07:58first job14:19last job34mdrive from last15:14punch out8.6hclocked2.0hroute drive / day2 stops · 21m evening · shop +3m over
07:02punch in24mdrive to 1st07:30first job17:08last job33mdrive from last17:41punch out10.7hclocked2.3hroute drive / day7 stops · 0m evening
Gap = clock-in to first stop (or last stop to clock-out) minus the estimated drive, straight-line at 35 mph. Hover any bar segment for the exact times. Indirect = paid man-hours minus on-the-job man-hours for the same days. Data for a day completes about 5:30 the next morning. Revenue produced (headline) is the full RG-produced total for the period; the per-tech cards below show only crew-tapped production, so they sum a little lower.